Removing the Capping Station on the DTG M2 and M4 Garment Printer

customer

Buy the capping station for the DTG M2 and M4 Garment Printer Here!

Buy parts for the DTG M2 and M4 Garment Printer Here!

5.2.3 Removing the Pump/ Cap Assembly

M2_REMOVING_CAPPING_STATION
  1. Switch the Printer OFF.
  2. Carry out the head park procedure.
  3. M2_REMOVING_CAPPING_STATION
  1. Remove the allen screw as shown then remove the CR Lock Detent Cover.
  2. Slide the cover towards the front of the printer and lift the cover up and off.
  3. M2_REMOVING_CAPPING_STATION
  4. Remove the two cross point screws retaining the waste flushing unit.
  5. Remove the waste flushing unit.
  6. M2_REMOVING_CAPPING_STATION
  7. Locate the pump motor wiring harness (to the rear & below the carriage rail) as shown below.
  8. Carefully unplug the pump harness from the cable connector.
  9. M2_REMOVING_CAPPING_STATION
  10. Remove the two rear retaining cross point screws (below rear of carriage rail) as shown.
  11. Next remove the two front retaining cross point screws.
  12. M2_REMOVING_CAPPING_STATION
  13. Gently lift the pump cap assembly out by lifting the front portion up and out.
  14. Rotate the assembly anti-clock wise to access the pump phase sensor connector.
  15. M2_REMOVING_CAPPING_STATION
  16. Disconnect the pump phase sensor connector from the pump assembly.
  17. Carefully lift the pump cap assembly out of the printer.
  18. M2_REMOVING_CAPPING_STATION
  19. The waste drain can now be cleaned out.
  20. The pump cap assembly is shown here in the lower right picture.
  21. M2_REMOVING_CAPPING_STATION